Coal Handling Plant And System

We at Destiny Solutions and Engineers offer you with Coal Handling Plant and System which is manufactured using super grade raw material and upgraded technology by our skilled professionals. This plants main function is to receive, process, store and feed the coal bunkers consistently over the entire life of the power plant. This plant is known for its high performance, good tensile strength, compact structure, seamless finish, highly efficient, corrosion and rust resistant, extended service life, and eco-friendly in nature. Coal Handling Plant and System is provided to you in wide varieties such as Industrial Material Handling Plant, 100 Tons Capacity Coal Handling Plant, Boiler Fuel Handling Plant and much more. This system is easy to install and operate in a continuous manner. This is very economical to use and is available to our clients at nominal prices, as per their requirements.

Product Image (001)

Coal Handling System

Price: 500000.00 - 1500000.00 INR/Unit
  • Supply Ability:1 Per Week
  • Delivery Time:1 Week
Product Image (04)

Boiler Fuel Handling Plant

Price: 550000.00 INR/Unit
  • Delivery Time:1-5 Week
  • Supply Ability:3-5 Per Month
  • Voltage:220 to 415 Volt (v)
  • Material:MS
  • Automatic Grade:Semi-Automatic
  • Warranty:1 year
  • Control System:PLC Control
  • Drive Type:Electric
Product Image (05)

Industrial Material Handling Plant

Price: 650000.00 INR/Unit
  • Delivery Time:1-5 Week
  • Supply Ability:3-5 Per Month
  • Voltage:220 to 415 Volt (v)
  • Material:MS
  • Control System:Human Machine Interface
  • Warranty:1 year
  • Automatic Grade:Automatic
  • Type:Material Handling Plant
  • Drive Type:Electric
Product Image (01)

Industrial Coal Handling Plant

Price: 100000 INR/Unit
  • Drive Type:Electric
  • Voltage:220 to 415 Volt (v)
  • Material:MS
  • Automatic Grade:Semi-Automatic
  • Warranty:1 year
  • Control System:Human Machine Interface
  • Type:Industrial Coal Handling Plant
  • Delivery Time:1-5 Week
  • Supply Ability:3-5 Per Month
Product Image (02)

100 Tons Capacity Coal Handling Plant

Price: 100000 INR/Unit
  • Drive Type:Electric
  • Voltage:220 to 415 Volt (v)
  • Material:MS
  • Warranty:1 year
  • Control System:Human Machine Interface
  • Automatic Grade:Semi-Automatic
  • Type:Coal Handling Plant
  • Supply Ability:3-5 Per Month
  • Delivery Time:1-5 Days
Product Image (06)

Fuel Handling System

Price: 100000 INR/Unit
  • Material:MS
  • Voltage:220 to 415 Volt (v)
  • Control System:PLC Control
  • Warranty:1 year
  • Automatic Grade:Automatic
  • Drive Type:Electric
  • Delivery Time:1-5 Week
  • Supply Ability:3-5 Per Month
Product Image (03)

Bagasse Handling Plant

Price: 285000.00 INR/Unit
  • Material:MS
  • Type:Bagasse Handling Plant
  • Warranty:1 year
  • Delivery Time:1-5 Week
  • Supply Ability:3-5 Per Month
X


Back to top
DESTINY SOLUTIONS AND ENGINEERS All Rights Reserved.(Terms of Use)
Developed and Managed by Infocom Network Private Limited.